Bulk Project

  • Bulk Project
  • Power Transformer &
    Main Body Bulk Project
  • Transformer Bulk Project
  • Power Transformer Bulk Project
  • Transformer Deliveries – Salem, WV
  • Transformer Deliveries – NYC, USA
  • Transformer Deliveries – OSLO, NORWAY
  • Heat Exchange Units Deliveries – KOPER, SLOVENIA

Project

Project

Main Tank

[Package No.85#1-01]

[Package No.92#1-01]

[Package No.95#1-01]

Shipments

The shipments were delivered to ship's side by cargo lowboy trucks

Lifting Operation

The shipments were lifting operation by means of the shore gantry crane using cargo polyester round slings

[G/Weight - 49,200 Kgs]

Stowage/Securing condition

Stowage/securing condition in Bay No.66, Slot No. 07/05/03/01/02, Tier No.18

[G/Weight - 49,200 Kgs]

[Package No.95#1-01]

[Package No.85#1-01]

Project

Project

Shipment

Lifting Operation

Power Transformer Bulk Project

Project

NYC, USA

OSLO, NORWAY

KOPER, SLOVENIA

Project

Project

Project